Nagpur Metro Builds 257-Metre Elevated Bridge Over Railway Tracks
Nagpur Metro is constructing a 257-metre-long elevated bridge about 80 feet above railway tracks at Uppalwadi as part of its Phase-II expansion. The bridge will cross three railway lines using the balanced cantilever technique, which avoids scaffolding beneath. This structure is part of the 6.92-km Reach-2A corridor towards Kamptee.
Economic Times··Nagpur



